IRC 15 — Code of Practice for Construction of Jointed Plain Concrete Pavements (Fifth Revision)
IRC 15:2017 is the Indian standard code of practice for the construction of jointed plain concrete pavements (JPCP). It provides comprehensive guidelines on materials, equipment, mix design, subgrade and sub-base preparation, joint detailing, reinforcement, placing, finishing, curing, and quality control to ensure durable and high-quality concrete pavements. This standard is essential for civil engineers, contractors, and highway authorities involved in the design and construction of rigid pavements on roads and highways.
IRC 15:2017 is the Indian standard code of practice for the construction of jointed plain concrete pavements (JPCP). It provides comprehensive guidelines on materials, equipment, mix design, subgrade and sub-base preparation, joint detailing, reinforcement, placing, finishing, curing, and quality control to ensure durable and high-quality concrete pavements. This standard is essential for civil engineers, contractors, and highway authorities involved in the design and construction of rigid pavements on roads and highways.
الجمهور
من يستخدم هذا المعيار
Highway and Pavement Engineers
Civil Engineering Contractors
Quality Control Inspectors
Construction Project Managers
Government Road Authorities
Materials Testing Laboratories
Consulting Engineers
المحتويات
المواضيع الرئيسية المغطاة
✓Materials selection and specifications
✓Subgrade and sub-base preparation
✓Concrete mix proportioning and batching
✓Tools, plants, and equipment requirements
✓Joint types and construction (contraction, expansion, longitudinal)
✓Reinforcement detailing and placement
✓Concrete placing, finishing, and curing methods
✓Surface tolerance and riding quality criteria
✓Quality control and acceptance testing
✓Handling cold weather concreting
✓Use of admixtures and mineral additives
✓Repair and maintenance of concrete pavements
الهيكل
جدول المحتويات
1Scope▼
Detailed content not available.
2General Requirements▼
Detailed content not available.
3Materials▼
Detailed content not available.
4Mix Proportioning and Concrete Properties▼
Detailed content not available.
5Tools, Plants and Equipment▼
Detailed content not available.
6Subgrade and Sub-base Preparation▼
Detailed content not available.
7Concrete Production and Handling▼
Detailed content not available.
8Joint Construction and Reinforcement▼
Detailed content not available.
9Storage and Handling of Cement▼
Detailed content not available.
10Concrete Placing, Finishing and Curing▼
Detailed content not available.
11Trial Length and Preliminary Testing▼
Detailed content not available.
12Quality Control and Acceptance Criteria▼
Detailed content not available.
الأسئلة المتكررة
الأسئلة الشائعة حول IRC 15
?What are the specified materials and their quality requirements for jointed plain concrete pavements under IRC 15?▼
Detailed answer not available.
?How should subgrade and sub-base layers be prepared to meet the standard's criteria?▼
Detailed answer not available.
?What types of joints are recommended and how should they be constructed and sealed?▼
Detailed answer not available.
?What are the guidelines for curing and finishing to ensure pavement durability and surface quality?▼
Detailed answer not available.
?How is quality control implemented during construction and what acceptance criteria must be met?▼
Detailed answer not available.
✦
هل تحتاج إلى إجابات تفصيلية للبند؟
اسأل AI عن أي بند، متطلب، أو حكم في IRC 15. احصل على ردود فورية مع الاستشهاد بالبند مدعومة بمكتبتنا المفهرسة.