IS 1635:1992 provides comprehensive guidelines for the field slaking of building lime and the preparation of lime putty, specifically for Class B, C, D, and F limes. It is essential for construction professionals involved in on-site lime processing where standard hydrated lime is unavailable, ensuring proper slaking methods to prevent defects in mortars and plasters and to promote durable, high-quality construction.
نظرة عامة
IS 1635:1992 provides comprehensive guidelines for the field slaking of building lime and the preparation of lime putty, specifically for Class B, C, D, and F limes. It is essential for construction professionals involved in on-site lime processing where standard hydrated lime is unavailable, ensuring proper slaking methods to prevent defects in mortars and plasters and to promote durable, high-quality construction.
الجمهور
المحتويات
الهيكل
IS 1635: Scope & Related Specifications
Scope: IS 1635 covers specifications for building limes used in construction, focusing on their quality, types, and testing methods.
Related Standards:
Key Information for Planning Slaking Operation:
| Property | Requirement (Building Lime) |
|---|---|
| Calcium Oxide (CaO) | ≥ 70% (for quicklime) |
| Magnesium Oxide (MgO) | ≤ 5% |
| Loss on Ignition | ≤ 5% |
| Hydration Time | 24-48 hours (depends on lime type) |
flowchart LR
Quicklime -->|Add water| Slaking
Slaking -->|Heat + Reaction| Hydrated Lime
Hydrated Lime -->|Cooling| Ready for Use
This ensures lime meets IS 712 & IS 1635 quality for construction use.
IS 1635 references important related standards, particularly for building lime specifications:
| Property | Requirement |
|---|---|
| Calcium oxide content | Minimum 70% (for quicklime) |
| Magnesium oxide content | Max 5% |
| Loss on ignition | Max 10% |
| Fineness | 90% passing 90 microns sieve |
[ CaO + H_2O \rightarrow Ca(OH)_2 + \text{heat} ]
This exothermic reaction is fundamental for lime setting and strength gain.
flowchart LR
CaO[Quicklime (CaO)]
H2O[Water (H₂O)]
CaOH2[Hydrated Lime (Ca(OH)₂)]
CaO -->|Add Water| CaOH2
CaOH2 -->|Used in| Mortar & Plaster
For detailed chemical and physical properties, refer to IS 712 and IS 1635 tables.
IS 1635 references definitions and classifications from related standards:
| Lime Type | Description | Key Use |
|---|---|---|
| Quicklime | CaO, obtained by calcining limestone | Used in construction, chemical processes |
| Hydrated lime | Ca(OH)₂, produced by slaking quicklime | Used in mortar, soil stabilization |
[ \text{CaO} + \text{H}_2\text{O} \rightarrow \text{Ca(OH)}_2 + \text{Heat} ]
For detailed definitions and specifications, consult IS 6508 and IS 712 alongside IS 1635.
IS 1635 - Necessary Information for Slaking Quicklime
Slaking Methods:
Importance:
| Aspect | Requirement |
|---|---|
| Tank Material | Watertight, lime-resistant lining |
| Lime to Water Ratio | Sufficient water to fully hydrate lime (approx. 2.5 to 3 parts water by weight) |
| Mixing | Continuous stirring for uniform slaking |
| Slaking Time | Typically 24 to 48 hours for full hydration |
flowchart LR
A[Quicklime] --> B{Slaking Method}
B --> C[Tank Slaking: Add Lime to Water]
B --> D[Platform Slaking: Add Water to Lime]
C --> E[Lime Putty]
D --> F[Partially Hydrated Lime]
E --> G[Good Mortar/Plaster Quality]
F --> H[Defects & Maintenance Issues]
This approach ensures sound construction and durability of lime-based materials.
IS 1635: Storage of Quicklime Before Slaking - Key Points
Quicklime Storage:
Slaking Preparation (Clause 6.2.2.1):
Putty Preparation (Clause 6.2.2.1):
| Step | Specification |
|---|---|
| Layer thickness | 150 mm |
| Water addition | Small quantities, gradual |
| Slaking duration | ~24 hours |
| Screening sieve | 3.35 mm IS sieve |
| Storage of slaked lime | Dry, covered or polyethylene-lined bags |
flowchart TD
A[Quicklime Storage] --> B[Spread in 150 mm layer]
B --> C[Sprinkle water gradually]
C --> D[Turn heap repeatedly]
D --> E[Slaking for ~24 hours]
E --> F[Screen through 3.35 mm sieve]
F --> G[Store slaked lime dry or pack]
Note: Always ensure quicklime is stored away from moisture to avoid hazardous reactions.
IS 1635: Slaking Quicklime & Preparation of Putty
| Step | Details |
|---|---|
| Lime layer thickness | 150 mm |
| Water addition | Gradual, minimum required |
| Slaking time (platform) | ~24 hours |
| Sieve size for screening | 3.35 mm IS sieve |
| Putty maturation time | Class C/D: ≥16 hrs; B/F: ≤12 hrs |
| Tank lining | Lime-resistant (brick recommended) |
flowchart TD
A[Quicklime] --> B[Spread on platform (150 mm thick)]
B --> C[Sprinkle water gradually]
C --> D[Turn heap repeatedly]
D --> E[Slaking for ~24 hours]
E --> F[Screen through 3.35 mm sieve]
F --> G[Dry hydrated lime powder]
G --> H[Add water + stir]
H --> I[Putty maturation (12-16 hrs)]
I --> J[Ready lime putty]
**
IS 1635 - Preliminary Cleaning (Clause 6.1)
| Step | Action | Purpose |
|---|---|---|
| Remove unslaked lime | Manual or mechanical cleaning | Avoid contamination |
| Clear residual materials | Sweep and wash if necessary | Ensure uniform slaking |
| Inspect receptacle | Visual check for debris | Maintain quality of lime slurry |
flowchart TD
A[Start] --> B[Clean Slaking Receptacle]
B --> C[Remove Unslaked Lime]
C --> D[Remove Residual Materials]
D --> E[Inspect for Cleanliness]
E --> F[Ready for Slaking Operation]
For detailed slaking procedures, refer to Clause 6.2 and related IS standards.
IS 1635 - Slaking Procedure (Clause 6.2)
Slaking Methods:
Purpose:
| Parameter | Recommendation |
|---|---|
| Lime to Water Ratio | Sufficient water to fully hydrate lime (approx. 2.5 to 3 times lime volume) |
| Slaking Duration | Minimum 24 hours for thorough hydration |
| Tank Material | Brick-lined, water-tight |
flowchart TD
A[Quicklime] --> B{Slaking Method}
B -->|Tank Slaking| C[Lime added to Water]
B -->|Platform Slaking| D[Water added to Lime]
C --> E[Lime Putty (Preferred)]
D --> F[Slaked Lime (Less uniform)]
Ensure complete slaking to prevent mortar/plaster defects and guarantee durability.
IS 1635 - Tank Slaking Key Points
| Parameter | Specification |
|---|---|
| Upper tank depth | 400 mm |
| Lower tank depth | 750 - 800 mm |
| Sieve aperture size | 3.35 mm (IS Sieve as per IS 460) |
| Tank lining | Brick lining (lime resistant) |
flowchart TD
A[Quicklime + Water] --> B[Upper Tank (400 mm)]
B -->|Milk of Lime| C[3.35 mm IS Sieve]
C --> D[Lower Tank (750-800 mm)]
D --> E[Lime Putty Maturation]
E --> F[Use Lime Putty]
This arrangement ensures continuous slaking with proper settling and maturation of lime putty.
IS 1635 - Platform Slaking (Clause 6.2.2)
| Aspect | Details |
|---|---|
| Water addition | Water added gradually to quicklime |
| Mixing | Continuous stirring to avoid lumps |
| Duration | Until lime is fully slaked (no dry lumps) |
| Safety | Controlled water addition to avoid overheating and spattering |
flowchart TD
A[Quicklime on Platform] --> B[Add Water Gradually]
B --> C[Mix Continuously]
C --> D{Fully Slaked?}
D -- No --> B
D -- Yes --> E[Hydrated Lime Ready]
For detailed design, refer to IS 1635 Clause 6.2 and ensure platform integrity and safety during slaking.
IS 1635: Preparation of Lime Putty (Class B, C, D, F)
| Parameter | Value/Specification |
|---|---|
| Water to Quicklime Ratio | Approx. 2.5 to 3 parts water by weight |
| Slaking Time | 24 to 48 hours (field slaking) |
| Storage | Under water in airtight containers |
| Consistency | Smooth, lump-free, creamy paste |
flowchart LR
A[Quicklime] --> B[Add Water Gradually]
B --> C[Slaking (24-48 hrs)]
C --> D[Mix to form Putty]
D --> E[Store Under Water]
E --> F[Use Putty ASAP]
This ensures a high-quality lime putty suitable for masonry and plastering works as per IS 1635.
IS 1635: Storage of Building Lime After Slaking
Slaking Quicklime to Dry Hydrated Lime (Clause 6.2.2.1):
Storage of Dry Slaked Lime (Clause 7.1):
Putty Preparation (Clause 6.2.2.1):
Continuous Slaking Setup (Clause 6.2.1.1):
| Aspect | Specification |
|---|---|
| Slaking layer thickness | 150 mm |
| Slaking duration | ~24 hours |
| Sieve size for screening | 3.35 mm IS Sieve |
| Dry storage (short term) | Covered platform |
| Dry storage (long term) | Polyethylene-lined gunny bags, dry godown (≤ 2 months) |
| Putty maturation time | Class C/D: ≥16 hrs, Class B/F: ≤12 hrs |
| Slaking tank depths |
IS 1635: Precautions During Slaking and Handling of Quicklime
| Aspect | Specification / Precaution |
|---|---|
| Quicklime Moisture | Keep moisture content minimal before slaking |
| Water Addition | Add water slowly and uniformly to quicklime |
| Temperature Control | Monitor temperature to avoid overheating (>100°C) |
| Storage Conditions | Store in dry, covered, and well-ventilated areas |
| Handling | Use protective gear; avoid direct contact with water |
[ \text{CaO} + \text{H}_2\text{O} \rightarrow \text{Ca(OH)}_2 + \text{Heat} ]
flowchart LR
A[Quicklime (CaO)] -->|Add water slowly| B[Slaking Reaction]
B --> C[Calcium Hydroxide Ca(OH)2]
B --> D[Heat Released (Exothermic)]
D --> E[Fire Hazard Precautions]
A --> F[Dry Storage & Handling]
Always ensure controlled slaking to prevent accidents and maintain quality of hydrated lime.
IS 1635: Fire Hazard Precautions for Quicklime
Clause 8.1:
Clause 8.5 (Table 8 - Precautions):
| Hazard | Precaution |
|---|---|
| Contact of quicklime & water | Prevent contact before slaking |
| Heat from slaking reaction | Handle with care; ensure no moisture exposure |
| Skin burns from hot lime | Workers to oil skin regularly to avoid cracks |
flowchart TD
A[Quicklime Storage] -->|No Water Contact| B[Handling & Transit]
B --> C[Slaking Process]
C -->|Heat & Reaction| D[Fire Hazard]
D --> E[Precautions]
E --> F[Oil Skin for Workers]
E --> G[Use PPE]
E --> H[Dry Storage]
Note: IS 1635 emphasizes strict control of moisture exposure to prevent fire hazards and personal injury during quicklime handling and slaking.
IS 1635 — Dust and Respiratory Protection Key Points
| Hazard | Protection Measures |
|---|---|
| Lime dust inhalation | Goggles + Respirators |
| Skin burns (quicklime) | Rubber gloves, gum boots, skin cream |
| Hot slaked lime | Daily skin oiling, avoid skin cracks |
| Eye irritation | Goggles |
| Post-exposure | Wash with fresh water |
flowchart LR
A[Lime Dust Exposure] --> B{Hazard Type}
B -->|Inhalation| C[Goggles + Respirators]
B -->|Skin Contact| D[Rubber Gloves + Gum Boots + Skin Cream]
B -->|Hot Slaked Lime| E[Daily Skin Oiling]
B -->|Eye Irritation| C
F[Post Exposure] --> G[Wash with Fresh Water]
Ensure strict adherence to these precautions to maintain worker safety when handling lime materials.
الأسئلة المتكررة
According to IS 1635, the recommended field slaking methods for quicklime are:
| Method | Lime to Water or Water to Lime | Product Type | Key Points |
|---|---|---|---|
| Tank Slaking | Lime to Water | Lime Putty | Stir constantly, no lime exposed |
| Platform Slaking | Water to Lime | Dry Hydrated Lime | Turn heap, 24 hrs slaking |
جارٍ تحميل المخطط…
Preparation and Maturation of Lime Putty (IS 1635):
Slaking Process:
Putty Preparation:
Storage:
| Lime Class | Maturation Time (Putty) | Storage Condition |
|---|---|---|
| Fat Lime (C, D) | ≥ 16 hours (or 3 days) | Under water |
| Semi-hydraulic (B, F) | ≤ 12 hours (or 2 days) | Under water |
جارٍ تحميل المخطط…
This ensures complete slaking, improved workability, and prevents drying before use.
Safety Precautions During Slaking of Quicklime (IS 1635)
Avoid contact of quicklime with water before slaking: Quicklime must be stored, handled, and transported dry to prevent premature reaction and hazards (Clause 8.1).
Add lime to water, not water to lime: Fill the tank with water (~300 mm depth) first, then gradually add quicklime while continuously stirring to prevent localized overheating and boiling (Clause 6.2.1.2).
Maintain lime submerged: Ensure lime stays fully covered by water during slaking to avoid exposure and violent reactions.
Control heat evolution: Slaking is exothermic; expect water to boil. Add lime and water gradually to control temperature rise.
Continuous stirring: After slaking, continue stirring to complete the reaction and prevent lumps or unreacted pockets.
Fire hazard precautions: Due to heat generation, keep fire safety measures ready around the slaking area (Clause 8.1).
جارٍ تحميل المخطط…
Summary: Always add lime to water with stirring, keep lime submerged, prevent premature moisture contact, and prepare for heat/fire hazards during slaking.
Storage Guidelines for Quicklime and Slaked Lime (IS 1635):
جارٍ تحميل المخطط…
This ensures quality preservation by minimizing moisture and atmospheric exposure.
Differences between Tank Slaking and Platform Slaking (IS 1635):
| Aspect | Tank Slaking | Platform Slaking |
|---|---|---|
| Method | Add lime to water in a water-tight tank with stirring | Add water to lime on a platform surface |
| Product | Directly produces lime putty suitable for use | Slaked lime, but may not achieve full slaking |
| Control | Better control of slaking due to constant stirring and immersion | Difficult to ensure complete slaking; lime may get exposed |
| Tank Design | Brick-lined tank, two-stage system with higher and lower tanks for continuous operation | Open platform, no containment |
| Heat Evolution | Controlled; water boils due to exothermic reaction, ensuring full slaking | Heat dissipation less controlled, risk of incomplete slaking |
| Quality | Produces uniform, fully slaked lime putty | Slaking may be incomplete, affecting quality |
جارٍ تحميل المخطط…
Effect of Improper Slaking on Mortar and Plaster Quality (IS 1635):
Key points from IS 1635:
| Issue | Result in Mortar/Plaster |
|---|---|
| Incomplete slaking | Cracks, powdering, weak strength |
| Excess water | Reduced strength, shrinkage cracks |
| Improper storage | Loss of lime quality, contamination |
جارٍ تحميل المخطط…
IS 1635 Recommendations for Continuous Slaking Setup:
Two-Tank System:
Tank Construction:
Operational Notes:
جارٍ تحميل المخطط…
This setup ensures efficient, continuous production of lime putty per IS 1635.
اسأل AI عن أي بند، متطلب، أو حكم في IS 1635. احصل على ردود فورية مع الاستشهاد بالبند مدعومة بمكتبتنا المفهرسة.
الطبقة المجانية تشمل 150 استعلامًا (50 AI + 100 مرجعي) · لا حاجة لبطاقة ائتمان